Congresso Ambiental A.Hak Dutos Liderroll Soluções Permanentes de Engenharia IBC Brasil
 
  Postos de GNV   Oficinas Credenciadas   Carta do Leitor   Patrocinadores   Fale Conosco   GNV    
 
 
  Página Inicial
  Gás Natural
  Termelétricas
  GD - Geração Distribuída
  GNL
  Distribuição
  Produção
  Legislação
  Nov. Tecnológicas
  Instituições
  Cursos & Eventos
   


Congresso Ambiental
Water Use
A.Hak Dutos
Stemac
Dresser Waukesha
    Acesse o Guia de Empresas do GasNet Acesse o Guia de Empresas do GNV
Produção - Artigos
  Autor/Fonte: Oil&Gas Journal
  Data: 4/3/2010

    Shtokman partners delay production start


Citing “changes in the market situation and particularly in the LNG market,” Shtokman Development AG has delayed by 3 years the start-up of production from Shtokman gas-condensate field in the Barents Sea. The partnership of Gazprom, Total, and Statoil said final investment decisions on pipeline gas will be made in March 2011 and on LNG before the end of 2011.

That schedule will allow for the start of pipeline gas production in 2016 and of LNG in 2017, each 3 years later than initially planned. The field, discovered in 1988, holds an estimated 135 tcf (3,8 trillion m3) of recoverable gas. It lies in 1,100 ft (335m) of water near the edge of winter sea ice.

The Shtokman partners have decided to treat offshore production facilities, the pipeline to shore, and onshore gas treatment as a stage in the first phase of the development project separate from LNG work.

 

The first phase targets production of 2.4 bcfd (68 million m3/day) of gas from 20 producing wells drilled from three subsea templates. It includes installation of a floating production unit, construction of two dual-phase pipelines to shore, construction of a liquefaction plant at Teriberka, and a link to the North Stream pipeline serving Europe.

 

 

Fonte: Oil&Gas Journal, fevereiro/10

 


   
 
Digite seu e-mail para receber nosso Boletim Semanal:
  
 
 
Digite o que deseja pesquisar:
Em
  
   
  Gasodutos
  Cogeração
  GNC
 
 
XXI World Energy Congress Montreal 2010
(12/9/2010 - 16/9/2010)
Montreal
PennWell
Fax: +1 (713) 963 6201

 
 
Rio Oil & Gas 2010
(13/9/2010 - 16/9/2010)
Rio de Janeiro
IBP - Gerência de Eventos
Fax: (21) 2112-9000

 
 
Integridade Estrutural de Equipamentos
(13/9/2010 - 17/9/2010)
Rio de Janeiro/RJ
NTT - Treinamento Avançado

 
 
 
 
  CopyRight © GasNet - 2007